Lots of garage progress

the long weekend is off to a great start with three crews on site to push us a little father toward completion.  

The garage drywall means not only is electrical work done but we can get the custom garage doors we ordered a while back installed.  Key with these is to get the drywall on before attempting any install of the garage motor and tracks. Piecing drywall onto the ceiling around all that stuff is really hard.   

 

IMAGE.JPG

More fun with backsplash material

the tile crew was back to finish some last work and fill in a few areas where we ran out of tile.  All the kitchen backsplash projects are done and most of the powder rooms. Some grout remains and then we can call the tile work complete.  So far the wall tile project has been a success and I like all the selections particularly the creative dining room feature walls   Fun but expensive is how I’d describe those.  

 

IMAGE.JPG
IMAGE.JPG

Farmer fixing the ridiculous storm water basin manhole lid height

Luckily I was able to locate a riser piece for the garage manhole from a local salvage yard. The pieces can be very expensive to purchase new.  Lafarge wanted over $300 for the concrete donut I located used at the salvage place east of the ring road.  Score another win for kijiji and the crazy collectors who not only horde odd materials but are willing to sell them to you for a good price.  

 

IMAGE.JPG

200 kg worth of concrete donut ready to be reused at the rowhouse  

Advertising hiatus

Due to the high volume of inquiries I can no longer manage the process in such a way that is fair to anyone looking for an apartment.  For now the signage and listing will be taken down. 

 

IMAGE.JPG

814 views in a five day period has led to a lot of calls.  Too many to answer so there is no alternative except to cease advertising until the building is safely complete and approved by the city. 

Leasing update

For now we have removed the advertising from the rent faster site so that I can focus on getting the building completed and the first occupants to move in.  Two of the three townhouses are reserved and just the end unit 2001 33 st remains available.

The interior finishing is underway at the end of this week, with cabinets and paint work to follow.  Garage building and sidewalks and stairs are also progressing.

here is a crude representation of the reservation situation for the townhomes.

here is a crude representation of the reservation situation for the townhomes.

Taping underway

The crew is starting drywall taping now. Once the ceiling texture is done and walls sanded, we can prime the walls and start interior finishing.   

 

IMAGE.JPG

Ready to tape  

 

IMAGE.JPG

Jiggi and JP, two of the best tapers working in Calgary, fortunately I have got them working for me for the last few jobs